First, the preparatory work before construction
1.1 site preparation
more at:jiahengstone
Before the construction of stone products, the construction of primary concrete should be completed and reach a certain strength. Should be coordinated before the start of indoor construction, outdoor construction units do a good job site transfer work for the timely start to create conditions.
Construction site control network measurement, according to the original coordinates of the site reference point and elevation, in accordance with the requirements of the design drawings, measured the main control axis, measured by the axis of stone paving line.
Organization of construction machinery and equipment approach, according to the construction machinery demand plan, according to the provisions of the location and manner, and should be the appropriate maintenance and commissioning and so on.
Organization of building materials approach, according to the requirements of the design drawings from the stone manufacturers into the processing of the production, according to the scene of the construction site of the material approach, according to the provisions of the location and manner of storage or storage.
1.2 technical preparation
Familiar with and review the construction drawings, and the regional pavement layout plans to deepen, and actively with the design, supervision, the owners to communicate, consultation. The preparation of the implementation of the construction program, and technical personnel to the construction workers. Construction site personnel at all levels must seriously study the construction program and construction specifications and other technical documents to reduce and avoid construction errors. Do a good job with the outdoor surface related to the link, to determine the connection with the professional closure of the measures.

Friday, October 6, 2017

Bathroom threshold stone and shower room threshold stone and shower room floor water paving standards

1, the bathroom threshold stone paving width and the depth of the door and the mouth of the same, the threshold of the stone and other materials on the ground level of seamless connection, the threshold of stone measured higher than the bathroom 5-10 mm, the inside of the left and right sides with the bathroom floor height difference Equal, the same project threshold stone and bathroom, laundry floor height difference should be consistent; more at:jiahengstone
2, flat open the door shower room threshold stone and water guide icon:
3, sliding door shower room threshold stone and water guide icon:
4, shower floor paving standards:
1) the middle area is higher than the surrounding water area 8-12mm, the same engineering standards should be consistent,
2) the middle area by 100mm * 100mm square open circular guide channel, easy to clean,
3) around the water guide area width of 105mm, leaving 1% of the water gradient, to ensure that the water naturally dry.
10, bathroom wall shelter and tissue paper box eaves plank pavement standard
1, home niche standard icon;
2, Tissue box cornice standard: length and the same as the outer edge of the tissue, the width of 100mm (single tube tissue box) / 120mm (double tube tissue box), the installation height from the tissue box along the 30mm, / 4 rounded corners, full width of the board polished.
11, Roman column regular size and installation standards
1, the Roman column in a different space, the size is different, but the ratio to be correct, the Roman column diameter is the height of one-ninth to one-tenth;
2, the Roman column should have marble column feet, wood or gypsum cylinder generally do not directly landing;
3, the Roman column to do Yamaguchi decoration, can not be installed against the wall, column feet away from the wall 60-150mm.