Install marble

Install marble landscaping stone with the installation of ceramic tile is the same. The main difference between the two is more important than the marble tiles. First, clean the floor. Check the base plate to make sure it is available. If the base plate is not strong, the grouting between the bricks will crack. If the floor needs to be fixed, but under the floor with joist or Jack to maintain balance. After that, you have to check the floor level. Detect the pitch of the floor with a long horizontal line. And check the level of the dip angle. If necessary, trim the floor. Horizontal floor is very important for the installation of marble floor.

Cement liner plate can be directly fixed to the plywood. This will help to strengthen the stone tile, because it is a very important marble tile. If the base plate is not strong enough to lead to marble floor cracking. If you choose not to use a cement liner, you may need to use other plywood to enhance the base floor. Marble tiles can be used in adhesives.

Once you're ready to base the floor stonegroupon , you can begin to install the marble floor. To find out the center of the room. Measure the length and width of the room, and mark the center of each line with a piece of chalk. Where the lines intersect is the center of the room. Now, the next step is very important. Try it on marble. This is very important, because if you can only use small pieces of bricks in the end, you need to change the center line slightly to avoid the end of the floor is too small. In order to maintain the appearance of symmetry, it is necessary to cross the midline.

Now you can start laying the marble floor. Start with the center. Spread out the brick. Cement on the line, preferably thin cement. Lay the bricks on the cement. According to this method to complete the laying work. Plastering cement and trowel slotted start from the center of the brick. Cement to cover the gap between the substrate, can be used to fill gaps in the cement mesh. This can prevent cracks in grouting. After all the bricks are to be laid on the cement, the distance between the brick and the brick must be kept between the 1/16 inch. This will ensure that the project is finished with a uniform interval.

After the completion of the work, such as cement dry to start sealing. Sealed by the best professionals, this step is very important, because the marble is very easy to be dyed. Remember to re paint every 9-18 months.